This week end as you can tell was split between Kenzie room, the attic, the deck, and my Buddy's Jordan's basement. It was a weekend where I got maybe 9hrs of sleep in two days (only 3 on Friday night). Since I already posted on Kenzie's new room, let's update you on the attic and the deck. I have been able to save a lot of wood from the deconstruction so I repurposed it for building my attic shelves. Part of getting Kenzie's room ready was cleaning out the remainder of stuff from the old storage room and putting it in the attic. Then on Saturday I tore down all but half of the last wall of the deck. Things are coming along great. I can wait to host some summer BBQ's this year.
I can't believe all this stuff was in one room in out basement!
No more upper floor!
Just one wall left to take down.
You can see I've got the sheeting in place for the last wall of the garage. It was so windy I had to put them up so Stacey (My Mustang) didn't get injured from flying debris.
These few joist are what was originally the deck when the house was first built. Just a landing with stairs.
No comments:
Post a Comment